A grid connection in the UK typically takes between 12 and 36 months from application to energisation. However, in areas with limited capacity or where major reinforcement is required, projects can take significantly longer.
In recent years, many renewable projects have experienced delays of 6–18 months due to upstream reinforcement requirements and network congestion.
What is the fastest possible grid connection?
Some small or well-located projects can connect in under 12 months.
Why do some projects take over 3 years?
Large infrastructure upgrades and grid congestion are the main reasons.
Can an ICP reduce timelines?
Yes, ICPs can streamline design and construction phases, reducing overall project time.